On this page
01. The problem02. How it works03. What to check before you buy04. How we set it up05. What we supply06. How to put it to the hospital07. Get a free survey and quote08. FAQ
Critical systems need a steady supply. Here is how UPS and backup keep nurse call, servers and cameras alive.
Key takeaways
- Ride-through
- Time for the generator
- Protected equipment
- Tested
01The problem
When the power dips, a server restarts, a nurse call panel resets and cameras go blind. A UPS rides through short cuts and gives time for a generator to start. Sized and tested, it keeps small systems alive when the mains fails.
02How it works
03What to check before you buy
| Check | Why it matters |
|---|---|
| Loads | List what the UPS must carry |
| Runtime | Minutes needed |
| Maintenance | Battery replacement |
| Generator link | Start and transfer |
| Maintenance | A plan, spares and a response time agreed before you buy |
| Your own requirements | Confirm them with your regulator and advisers |
04How we set it up
- 01Walk hospital IT and nurse callWe note every door, room, route and risk.
- 02Draw the planWhere UPS and backup power goes and what it covers.
- 03Cable and powerCabling, power and backup to every point.
- 04Fit and configureInstalled, set up and labelled.
- 05Test and trainWe test every point and train your staff.
05What we supply
We design, supply and install UPS and backup power for hospitals, clinics and care homes. Send us a plan or a photo and the number of rooms or doors and we reply with a written quote.
06How to put it to the hospital
Start with the problem hospital IT and nurse call already has, in the words your reader would use, then show what changes. Quote the full scope for hospital IT and nurse call, including cabling, power, installation, training and maintenance, and say plainly what the system does and does not do.
07Get a free survey and quote
08Frequently asked questions
How long should it run?
Until the generator starts and takes over.
Do batteries wear out?
Yes; plan replacement.
Can we test it?
We test at handover.


